ZJ30DBS-J,3000m oil drilling,750HP drilling rig
ZJ30DBS-J,3000m oil drilling,750HP drilling rig,petroleum,oil rig,drilling,oil equipment,drilling company,oil and gas,oil drill,land drilling,offshore drilling
ZJ30DBS-J,3000m oil drilling,750HP drilling rig,petroleum,oil rig,drilling,oil equipment,drilling company,oil and gas,oil drill,land drilling,offshore drilling
ZJ30DBS-J,3000m oil drilling,750HP drilling rig,petroleum,oil rig,drilling,oil equipment,drilling company,oil and gas,oil drill,land drilling,offshore drilling
Main Features
Adopting digitalcontrol technique, computer technique and integrating mechanics, electricity,
hydraulics and pneumatics into design, the intelligent control for drilling rig is realized through
PLC technology and touch screen.
Adopting AC VF motor drive, the drawworks , rotary table and mud pump achieves stepless
speed regulating function .
The drawworks is a structure with single shaft, gear transmission, stepless speed regulating,
the brake adopts hydraulic disk brake and dynamic brake together, with simple structure and reliable
performance.
Adopting constant WOB auto-bit-feed device, a patent of Honghua , the WOB is controlled precisely.
The rig operation has realized the functions for collecting, display, storing, printing and transfer of
drilling parameters, and the function of multi-points monitoring and communication.
The rig operation has realized the full digital-control or digital closed-loop control for traveling block position, trip speed, safety presetting and interlock protection,
and preventing “ collide up and impact down ” (crown and RT protection) .
with the online monitoring system for working s tatus of mechanical, electric, hydraulic and
pneumatic implements, failure alarm and failure self-diagnosis has been realized, the equipments can work normally and troubleshooting can be
done easily.
The driller control cabin is independent and lifted hydraulically, without contacting the drill floor,
with little vibration, and convenient for installation and teardown. The driller control cabin is
a pressurized unit for explosion – proof (certificated). The drillers can fitful all drilling operation parameter setting on the
operating chair, the operation manner has been improved and the labor intensity lightened greatly .
It can be equipped with rig moving device, satisfying the requirement for cluster well drilling.
Satisfying the requirement for TDS installation.
Basic Parameter Of Varied Rigs
Rig model | ZJ30DBS-J | |
Nominal drilling depth (114mm drill pipe) m | 6000-9000 | |
Max. hook load kN | 5850 | |
Max. drill line no. | 14 | |
Wireline diameter mm(in) | 42 (15/8) | |
Sheave OD mm(in) | 1524 (60) | |
Swivel center pipe bore diameter mm(in) | 75 (3) | |
Drawworks rated power kW(hp) | 2210 (3000) | |
Drawworks gear | 1 stepless change | |
Rotary table opening diameter mm(in) | 1257.3 (491/2) | |
Rotary table gear | 1 stepless change | |
Power/mud pump set kW(hp) | 1470 (2000) | |
Mast effective height m(ft) | 46 (152) | |
Drill floor height m(ft) | 10.5 (35) | 12 (40) |
Drill floor clearance m(ft) | 8.7(28.5) | 10 (33) |
Note: DB – AC VF drive rig |