Oilfield Automated Pipe Handling System
Our Core Values:
Good Attitude:with a good attitude in our work and life.
Active Action:with a active action to deal with all things.
Bright Future: to dream and believe the bright future.
Description
We has developed the automated drilling & workover pipe handling system, We has been dedicated to providing safe, efficient and cost-effective drilling and workover solutions for global customers.
Automated drilling & workover pipe handling system mainly consists of the intelligent pipe handling
system, pipe handling manipulators for monkey board and substructure, automated elevator, automated
power tongs, power catwalk, automated workover equipment, centralizer, etc. By now, automated
drilling & workover pipe handling system has been widely applied across the world.
Item | Parameter |
Applicable Drilling Rig Model | ZJ30-ZJ120 |
Pipe Size | 2 3/8”-8”(60.3-203.2 mm) |
Max. Handling Weight | 22,046 lbs; 10,000 Kg |
Max. Lifting Weight | 15,000 lbs; 6,800 Kg |
Control Mode | Hydraulic Control |
Operation Cycle | 75s (Adjustable) |
Description
• Unmanned operation at the monkey board.
• Modular design upgrading the drilling rigs.
• Multi-functional, needing no manipulator on the substructure.
• Available Manual/Auto controls and interlock safety protection.
• Whole-process visual monitoring of the working status in real-time.