4 1 2 Seamless Tubing and Casing Pipe
4 1 2 Seamless Tubing and Casing Pipe
Product DescriptionThe available Shengji seamless casing range from 4-1/2’’to 20’’ with material grades H40, J55, K55, N80, L80, C95, P110 etc. The thread options available include STC.BTC.LTC VAM and VAM TOP.
Key Feature
1. Sales volume around 120,000 tons per year.
2. Stable and reliable in quality.
3. Manufacture and testing according to API 5CT latest version.
4. Been sold to US, Syria, Oman.
5. STC.BTC.LTC VAM, VAM TOP thread are all available.
6. Defect detective 100% before delivery.
Specifications
Type | Size(O.D. ) | Nominal Weight | W.T. | I.D. | Coupling | |||
in | Mm | Lbf/ft | Kg/m | mm | mm | O.D.mm | Min length mm | |
NUE J55 L80 N80 P110 | 1.90 | 48.26 | 2.75 | 4.09 | 3.68 | 40.90 | 55.88 | 95.25 |
2 3/8 | 60.32 | 4.60 | 6.85 | 4.83 | 50.66 | 73.02 | 107.95 | |
2 7/8 | 73.02 | 6.40 | 9.52 | 5.51 | 62.00 | 88.90 | 130.18 | |
3 ½ | 88.90 | 9.20 | 13.69 | 6.45 | 76.00 | 107.95 | 142.88 | |
4 1/2 | 114.30 | 12.60 | 18.75 | 6.88 | 100.54 | 132.08 | 155.58 | |
EUE J55 L80 N80 P110
| 1.90 | 48.26 | 2.90 | 4.32 | 3.68 | 40.90 | 63.50 | 98.42 |
2 3/8 | 60.32 | 4.70 | 6.99 | 4.83 | 50.66 | 77.80 | 123.82 | |
2 7/8 | 73.02 | 6.50 | 9.67 | 5.51 | 62.00 | 93.17 | 133.35 | |
3 ½ | 88.90 | 9.30 | 13.84 | 6.45 | 76.00 | 114.30 | 146.05 | |
4 1/2 | 114.30 | 12.75 | 18.97 | 6.88 | 100.54 | 141.30 | 158.75 |
1.Outsourcing flat end tube
After purchasing the flat-end pipe into the factory, we strictly inspected the purchased flat-end pipe according to the requirements of the company's incoming inspection. Inspection items should include tensile properties, hardness, chemical composition, impact properties, grain size and inclusions, geometry, straightness, appearance.
2.Upsetting
The upsetting production line is fully automatic control, with reliable performance and advanced technology. The performance index of the equipment has reached the domestic advanced level, and the steel pipe can be upset from 2 3/8in to 5 1/2in.
Tubing Upsetting Production Line
In order to ensure the mechanical properties of the tubing end, the full length of the tubing should be heat treated according to API requirements after the pipe end is upsetting.
Tubing Heat Treatment Production Line
Performance Test
1.Magnetic Flux Leakage Testing
2. Ultrasonic Flaw Detection at the End of The Pipe
3.Magnetic Particle Inspection
4.X-ray Radiographic Inspection
5.Hydrostatic Test
Contact
High Pressure 2 3 8 EUE Seamless Steel Tubing High Pressure 2 3 8 EUE Seamless Steel Tubing High Pressure 2 3 8 EUE 4 1 2 Seamless Tubing and Casing Pipe